Jump to content

New Forth Road Bridge - Open/Closed still shit


D.A.F.C

Recommended Posts

Fantastic plan. We'd merely have to activate the flying cars cheat, problem solved.

f**k that, Edinburgh traffic/parking would still be as hellish as ever.

L1, L2, R1, R2, Up , Down, Left, Right, L1, L2, R1, R2, Up , Down, Left, Right.

Everybody can just jetpack themselves over. ;)

Link to comment
Share on other sites

I would have thought so, but the sheer volume of extra traffic will presumably create further problems.

In fact will the Kincardine Bridge cope with extra strain?

Better close it as a "precautionary" measure, imo.

Link to comment
Share on other sites

Any word on what traffic is like round Stirling due to the closure -any impact?

Looks alright, but then again it's only nearly 3 o'clock. Give it an hour and all north/south traffic will be jammed solid from north of Dunblane to the M876 junction and beyond. Would guess the road round Sprinkerse to Banockburn to the M8/M9 Services roundabout will be a mare too.

Not that I care as it will be a nice short trip home to be cozy in front of the fire with a beer in time to catch the end of pointless. Up ye.

Link to comment
Share on other sites

The Tories seem to want to keep the bridge open or use magic to fix it by next week or something:

Scottish Conservative transport spokesman Alex Johnstone has described the closure of the Forth Road Bridge "a scandal".

He added: "Although the repairs are necessary for the safety of the public, the fact that the decision has been taken to close it for so long, shows a complete lack of forward-thinking by Derek Mackay and the SNP government.

Link to comment
Share on other sites

Looks alright, but then again it's only nearly 3 o'clock. Give it an hour and all north/south traffic will be jammed solid from north of Dunblane to the M876 junction and beyond. Would guess the road round Sprinkerse to Banockburn to the M8/M9 Services roundabout will be a mare too.

Not that I care as it will be a nice short trip home to be cozy in front of the fire with a beer in time to catch the end of pointless. Up ye.

What we need is a bit of snow and ice to make the commute more of a challenge. Might get a reality show out of it.

Edited by Scary Bear
Link to comment
Share on other sites

What we need is a bit of snow and ice to make the commute more of a challenge. Might get a reality show out of it.

They should make a Tartan Noir film that starts with a body lying horizontally on the middle of the bridge, 6 fingered hand and webbed foot on the north side, normal hand and foot on the south.

Link to comment
Share on other sites

The Tories seem to want to keep the bridge open or use magic to fix it by next week or something:

Such is life. You would be a pretty shite opposition party if you didn't try to make political capital out of this.

Can't recall which of the parties were against the new bridge, but incidents like this make them look a bit shit. The Greens were on of the parties.

Edited by Scary Bear
Link to comment
Share on other sites

They should make a Tartan Noir film that starts with a body lying horizontally on the middle of the bridge, 6 fingered hand and webbed foot on the north side, normal hand and foot on the south.

Like it. "The Port Edgar Pentagram"

Link to comment
Share on other sites

Ludicrous to blame anyone for a defect in the bridge - these things happen.

What we can criticise is the (apparent) lack of planning for such an eventuality to occur. Given the importance of the route you'd have thought there would be a contingency plan in place that just needs dusted down when this happens.

Agreements with ferry operators, bespoke train and bus time tabling on trains, removal of some light controlled junctions etc. loads could be done automatically but doesn't seem to be

Link to comment
Share on other sites

Ludicrous to blame anyone for a defect in the bridge - these things happen.

What we can criticise is the (apparent) lack of planning for such an eventuality to occur. Given the importance of the route you'd have thought there would be a contingency plan in place that just needs dusted down when this happens.

Agreements with ferry operators, bespoke train and bus time tabling on trains, removal of some light controlled junctions etc. loads could be done automatically but doesn't seem to be

You could also possibly blame poor maintenance regime. Might be the case. Either way, there's going to be a lot of pissed off voters. Might as well make the most of it. People want someone to blame.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...